Carrington Buckingham Business Park

Project Overview

Carrington’s Buckingham Business Park has set a new standard in Sherwood Park for greenfield land development. The design of these commercial and light industrial offices and warehouses offers flexibility with the numerous units. To ensure the structure meets its versatile designs and remains safe for the tenants' intended uses, this commercial space was designed and constructed using steel roof framing, precast concrete insulated wall panels and pile foundations. 

Grubb Engineering worked on this project with our Structural Engineer of Record and Specialist Structural Design services for this approximately 27,200 square foot commercial structure.

This project was completed in 2016.

3D structural drawing for Carrington's Buckingham Business Park project

Project Points

Completion: 2016

Gross Floor Area:
Approximately 27,200 square feet​​​​​​​

Construction Materials:

  • Steel roof framing
  • Precast insulated wall panels
  • Pile foundations

Services Provided:

  • Structural Engineer of Record
  • Specialist Structural Design of wall panels and structural steel
  • Timeline: Concept
  • Timeline: Construction
  • Timeline: Completion