Oliver Crossing Apartments

Project Overview

Project Points

Completion: Summer 2023

Gross Floor Area: Approximately 220,000 square feet 

Construction Materials:

  • Load-bearing precast concrete insulated wall panels
  • Hollowcore floors
  • Lights teel frame load bearing walls
  • Precast concrete transfer slabs and beams
  • Precast columns
  • Steel screw pile foundations

Services Provided:

  • Structural Engineer of Record
  • Precast Specialist Engineering