Nisku Twin Arena

Project Overview

Project Points

Completion: Fall 2023

Gross Floor Area: 118,000 square feet

Construction Materials:

  • Steel screw pile foundations
  • Insulated precast concrete exterior walls
  • Precast concrete bleacher system
  • Hollowcore second floor
  • 160 foot clear span custom steel roof truss system

Services Provided:

  • Structural Engineer of Record
  • Precast Specialist Engineering and Detailing
  • Structural Steel Specialist Engineering